Kvar National Logo                          (888) KVAR NAT  (888) 582-7628

                                                                                                         
                                                            
       



Why Choose KVAR NATIONAL?

KVAR NATIONAL saves Money and Energy by improving Power Quality.   

KVAR NATIONAL has the expertise, knowledge, and experience to optimize the Power Factor of motors

KVAR NATIONAL uses Patented Apparatus and Method to quickly determine capacitance required to optimize Power Factor for each inductive load.

KVAR NATIONAL eliminates the need for costly and time-consuming Engineering Studies.   

KVAR NATIONAL keeps Facility project costs down. Industrial Installation Options include: 

  • Electrical Services provided, complete turnkey, from beginning of project through installation. 
  • "In-house" Electricians or Electrical Contractor of your choice

KVAR NATIONAL installers are Licensed Electricians. Units installed according to Article 460, NEC.   

KVAR NATIONAL Testimonials,
Case Studies, Information and Photos featured on this website are all customers of KVAR NATIONAL.   Kvar Installation, Recycling Facility, Custom-sized units

KVAR NATIONAL product is UL Listed. 

KVAR NATIONAL is Fully Insured.

KVAR NATIONAL is a Master Distributor, Recruiting and Training new DistributorsElectrical Contractors,  and Salespersons.  

KVAR NATIONAL welcomes 
Electricians to become a Certified KVAR NATIONAL installer.     
  

Kvar Counterfeit Unit
Be aware
that there are units available "on line" with low price points.  Many are manufactured with boxes easily opened, loose wires and capacitors. Components may be UL but the product may not be UL. Purchasing a knock-off unit can be dangerous.

Our COMPLETE product is UL, manufactured and installed acording to NEC 460.

Beware of Imposters; insist on the Genuine KVAR Unit!


KVAR NATIONAL
has a unique approach
   to helping industry improve Power Quality.   

1. Evaluate Electric Bills.  Evaluate Demand Charges, cost per Kwh, facility running hours. 

 

2. List Motors and Panels. Locate and Identify inductive loads

 

3. Walk through Survey. Evaluate facility from the “outside-in”, that is, starting from the outside envelope, working in.  Rooftop AC units, Air Handlers, large compressors, to Panel installed units for smaller multiple intermittent loads.

       

4. Estimate Cost of Project

 

5. Schedule and Perform Power Quality Testing. KVAR NATIONAL uses Patented Equipment and a Hioki 3197 Power Quality Analyzer, to quickly and effectively optimize Power Factor to Unity.

 

6. Submit Proposal. Recommendations of KVAR NATIONAL for KVAR Energy Recyclers. Installation Charges added, if needed.

                               

7. Proposal Accepted / Order Placed. Delivery in Approximately 2 weeks

 

8. Terms:   Down payment required on custom-sized products.   Checks payable to: KVAR NATIONAL       

               

9. Delivery.  Balance due upon delivery

Call Today!

Savings begin from the moment KVAR units are installed

 

(888) KVAR NAT

(888) 582-7628

Web Hosting